Skip to main content

Category

Projects

Temporary cofferdam of stacked concrete blocks and a steel box diverting water in the Muddy Gates drain

08 November 2026

Muddy Gates – Temporary Cofferdam

Category: Projects
Industry: Water

For Decmil’s Muddy Gates culvert upgrade near Tooradin, Cerecon designed a movable temporary cofferdam that let culverts be relined within a tidal zone – without expensive pump systems.

Read Post
Aerial view of the Burwood tunnel access shaft with steel retention struts installed

08 November 2026

Suburban Rail Loop – Burwood Tunnel Access Shaft

Category: Projects
Industry: Rail & Tunnelling

Cerecon delivered essential temporary works solutions for the Burwood Tunnel Access Shaft, a critical component of the Suburban Rail Loop, supporting the safe and efficient installation of the shaft’s ground retention system.

Read Post
Rail tracks running beneath the existing Grimshaw Street bridge in Watsonia

08 November 2026

North East Link – Grimshaw Street Bridge, Watsonia

Category: Projects
Industry: Bridges

Cerecon inspected and assessed the Grimshaw Street Bridge over the Hurstbridge Rail Line for Acciona, confirming it could safely support a 62-tonne piling rig with restricted loading paths.

Read Post
Hurstbridge line tracks entering the existing rail bridge tunnel in Watsonia

08 November 2026

North East Link – Hurstbridge Rail Bridge, Watsonia

Category: Projects
Industry: Bridges

For Acciona on the North East Link Program, Cerecon inspected and assessed the Hurstbridge Rail Bridge beneath the Greensborough Bypass, confirming it could safely carry heavy construction plant.

Read Post
Steel hoist protection screen installed against the shaft wall on the Metro Tunnel project

08 November 2026

Metro Tunnel – Hoist Protection Screen

Category: Projects
Industry: Rail & Tunnelling

Working with Cross Yarra Partnership on the Metro Tunnel project, Cerecon designed a specialised protection screen and cantilever platform to shield the site access hoist from load impacts.

Read Post
Temporary steel bridge spanning the underground pipelines at Maddox and Champion Road, Newport

08 November 2026

Maddox & Champion Rd, Newport

Category: Projects
Industry: Bridges

For the Level Crossing Removal Project, Cerecon designed a modular, reusable temporary bridge giving construction access over sensitive existing services at Maddox and Champion Road, Newport.

Read Post
Removable access bridge being installed across the track at Melbourne Central station platform

08 November 2026

Melbourne Central – Removable Access Bridge

Category: Projects
Industry: Rail & Tunnelling

Cerecon designed a lightweight, rolling cantilever access bridge at Melbourne Central that one or two people could install and remove during rail occupations.

Read Post
Gantry support framing on the street frontage of Melbourne Central

08 November 2026

Melbourne Central – Gantry Support Framing

Category: Projects
Industry: Rail & Tunnelling

Cerecon partnered with the Southern Program Alliance to design a steel frame supporting a gantry crane cantilevered over Swanston Street, adjacent to Melbourne Central.

Read Post
Crew rigging lifting equipment and stairs inside the south DRS shaft at Parliament Station

08 November 2026

Parliament Station – South DRS Lifting Monorail System

Category: Projects
Industry: Rail & Tunnelling

Cerecon engineered a dual-winch monorail lifting system to install steel stair modules in Parliament Station’s South Draught Relief Shaft, a shaft that changes from diagonal to vertical.

Read Post